Emergency Power Outage – Malibu Campus

Posted on

Southern California Edison (SCE) will be making an emergency repair to the Tyler Campus Center (TCC) main power system beginning around 8 p.m. to avoid a potential system failure.  The Malibu campus will remain open and classes will meet as scheduled.

The Department of Public Safety (DPS) is maintaining a perimeter around the TCC loading dock, and SCE has asked that the Pepperdine community avoid the area. The repair will require shutting off power to any buildings which are fed by this equipment. These  include the following Malibu campus buildings:

1)      TCC

2)      Smothers

3)      FFH

4)      HH

5)      HAWC

6)      APC

7)      RAC

8)      Elkins

9)      Payson

10)   PLC

11)   PCC

12)   Dorms

13)   Towers

14)   Lovernich

15)   CAC

16)   AMB

17)   KSC

18)   Chapel

19)   Tennis Pavilion

SCE expects the repairs to take up to three hours. For the latest news and information on this repair, please visit Pepperdine’s emergency blog at http://emergency.pepperdine.edu.